Document Notice of Transition to the Amended Impact Assessment Act

  • Project Hydrogen Ready Power Plant Project
  • Document Category: Additional Information
  • Reference Number: 49
  • Document Date: 2024-10-10
  • Document: 159293E.html
  • Relevance: 343.88
  • Notice of Transition to the Amended Impact Assessment Act   Ottawa — October 10, 2024 — On June 20, 2024, the Budget Implementation Act, 2024, No. 1 received Royal Assent and brought into force amendments to the Impact Assessment Act (the IAA). Transitional provision 305 of the Budget Implementation Act, 2024, No. 1 states that, in order to bring a designated project under the IAA, the Minister of Environment and Climate Change or the Impact Assessment Agency of Canada (IAAC) must take a ...
1 alternate format found
French HTML
  • Relevance: 292.88
  • Avis de transition à la Loi sur l'évaluation d'impact modifiée   Ottawa — 10 octobre 2024 — Le 20 juin 2024, la Loi no 1 d'exécution du budget de 2024 a reçu la sanction royale entraînant ainsi l'entrée en vigueur des modifications apportées à la Loi sur l'évaluation d'impact (la LEI). La disposition transitoire 305 de la Loi no 1 d'exécution du budget de 2024 stipule que, pour qu'un projet soit désigné en vertu de la LEI, le ministre de l'Environnement et du Changement climatique ou ...

Document Notice of Impact Assessment Decision with Reasons

  • Project Hydrogen Ready Power Plant Project
  • Document Category: Additional Information
  • Reference Number: 51
  • Document Date: 2024-10-10
  • Document: 159319E.html
  • Relevance: 343.88
  • Notice of Impact Assessment Decision with Reasons   Ottawa — October 10, 2024 — The Impact Assessment Agency of Canada (IAAC) decided that an impact assessment is not required for the Hydrogen Ready Power Plant Project (the project) proposed by Eastern Power Inc. (the proponent), located in Ontario. In accordance with subsection 16(2) of the Impact Assessment Act (the IAA), IAAC has considered each of the following factors: the Initial Project Description, and Response to the Summary ...
1 alternate format found
French HTML
  • Relevance: 292.88
  • Avis de décision relative à une évaluation d'impact avec motifs   Ottawa — 10 octobre 2024 — L'Agence d'évaluation d'impact du Canada (l'AEIC) a décidé qu'une évaluation d'impact n'est pas nécessaire pour le projet de centrale électrique prête pour l'hydrogène (le projet) proposé par Eastern Power Inc. (le promoteur), situé en Ontario. Conformément au paragraphe 16(2) de la Loi sur l'évaluation d'impact (la LEI), l'AEIC a pris en considération chacun des éléments suivants : la ...

Document Notice of Time Limit Suspension with Reasons

  • Project Hydrogen Ready Power Plant Project
  • Document Category: Additional Information
  • Reference Number: 44
  • Document Date: 2022-08-17
  • Document: 155366E.html
  • Relevance: 280.42
  • Notice of Time Limit Suspension with Reasons Ottawa — August 17, 2022 — On August 12, 2022, the Impact Assessment Agency of Canada (the Agency) suspended the 180-day time limit for the planning phase under the Impact Assessment Act for Eastern Power Inc.'s (the proponent) Hydrogen Ready Power Plant Project. The Agency has taken this action in consideration of a written request from the proponent that the time limit be suspended in order that it may have sufficient time to provide the Agency ...
1 alternate format found
French HTML
  • Relevance: 229.42
  • Avis de suspension du délai avec motifs Ottawa — 17 août 2022 — Le 12 août 2022, l'Agence d'évaluation d'impact du Canada (l'Agence) a suspendu le délai de 180 jours prévu pour l'étape préparatoire, en vertu de la Loi sur l'évaluation d'impact, pour le projet de centrale électrique prête pour l'hydrogène d'Eastern Power Inc. (le promoteur). L'Agence a pris cette mesure à la suite d'une demande écrite du promoteur (en anglais seulement) visant à suspendre le délai, afin de sortir qu'il ait ...

Document Summary of Issues

  • Project Hydrogen Ready Power Plant Project
  • Document Category: Additional Information
  • Reference Number: 33
  • Document Date: 2022-07-25
  • Document: 144559E.pdf
  • Relevance: 278.84
  • JULY 25, 2022 – HYDROGEN READY POWER PLANT PROJECT – SUMMARY OF ISSUES – PAGE 1 OF 3 Hydrogen Ready Power Plant Project – Summary of Issues This document provides a high-level summary of the issues submitted to the Impact Assessment Agency of Canada (the Agency) on the Hydrogen Ready Power Plant Project (the Project) during the comment period on the Initial Project Description submitted by the Eastern Power Inc. (the Proponent). The issues highlight the information needed to support ...
1 alternate format found
French PDF
  • Relevance: 227.84
  • 25 JUILLET 2022 – PROJET DE CENTRALE ÉLECTRIQUE PRÊTE POUR L'HYDROGÈNE – RÉSUMÉ DES ENJEUX – PAGE 1 DE 3 Projet de centrale électrique prête pour l’hydrogène – Résumé des enjeux Ce document présente un résumé de haut niveau des enjeux présentées à l’Agence d’évaluation d’impact du Canada (l’Agence) sur le projet de centrale électrique prête pour l’hydrogène (le projet) pendant la période de consultation sur la description initiale du projet soumise par Eastern Power Inc. (le ...

Document Public Notice - Participant Funding Available

  • Project Hydrogen Ready Power Plant Project
  • Document Category: For Public Participation
  • Reference Number: 4
  • Document Date: 2022-06-15
  • Document: 144140E.html
  • Relevance: 276.13
  • Public Notice Hydrogen Ready Power Plant Project Participant Funding Available June 15, 2022 — Funding provided by the Impact Assessment Agency of Canada (the Agency) is now available to help the public and Indigenous groups participate in the impact assessment process for the proposed Hydrogen Ready Power Plant Project, a natural gas and hydrogen-fueled electricity generating facility located approximately 15 kilometres south of Sarnia, in Ontario. Funding is available for eligible ...
1 alternate format found
French HTML
  • Relevance: 225.13
  • Avis public Projet de centrale électrique prête pour l'hydrogène Disponibilité d'une aide financière aux participants Le 15 juin 2022 — L'Agence d'évaluation d'impact du Canada (l'Agence) met à la disposition du public et des peuples autochtones une aide financière pour favoriser leur participation au processus d'évaluation d'impact du projet de centrale électrique prête pour l'hydrogène, une centrale électrique alimentée au gaz naturel et à l'hydrogène située à environ 15 kilomètres au ...

Document Public Notice - Public Comments Invited on a Summary of the Initial Project Description

  • Project Hydrogen Ready Power Plant Project
  • Document Category: For Public Participation
  • Reference Number: 1
  • Document Date: 2022-06-13
  • Document: 144085E.html
  • Relevance: 276
  • Public Notice Hydrogen Ready Power Plant Project Comments Invited on the Summary of the Initial Project Description What is happening? June 13, 2022 — Eastern Power Inc. is proposing the Hydrogen Ready Power Plant Project, an electricity generating facility located about 15 kilometres south of Sarnia, Ontario. The Impact Assessment Agency of Canada (the Agency) invites the public and Indigenous groups to review the summary of the Initial Project Description and provide comments on the ...
1 alternate format found
French HTML
  • Relevance: 225
  • Avis public Projet de centrale électrique prête pour l'hydrogène Période de consultation publique sur le résumé de la description initiale de projet Que se passe-t-il? Le 13 juin 2022 — Eastern Power Inc. propose le projet de centrale électrique prête pour l'hydrogène, une centrale électrique située à environ 15 kilomètres au sud de Sarnia, en Ontario. L'Agence d'évaluation d'impact du Canada invite le public et les groupes autochtones à examiner le résumé de la description initiale du ...

Document Summary of an Initial Project Description of a Designated Project

  • Project Hydrogen Ready Power Plant Project
  • Document Category: Additional Information
  • Reference Number: 2
  • Document Date: 2022-05-24
  • Document: 144095E.pdf
  • Relevance: 274.66
  • Hydrogen Ready Power Project IAAC Initial Project Description Summary Eastern Power Inc. Hydrogen Ready Power Plant Project Summary of Initial Project Description for a Designated Project under the Impact Assessment Act May 24, 2022 Prepared by: Bruce E. Holbein Ph.D. Reviewed by: Francis Itliong P.Eng. Approved by: Raman Raghavan P.Eng. Hydrogen Ready Power Project IAAC Initial Project Description Summary 1 GENERAL INFORMATION ...
1 alternate format found
French PDF
  • Relevance: 223.66
  • Eastern Power Inc. Projet de centrale électrique prête pour l'hydrogène Résumé de la Description Initiale du Projet pour un projet désigné en vertu de la Loi sur l'évaluation d'impact 24 mai 2022 Préparé par: Bruce E. Holbein Ph.D. Révisé par: Francis Itliong P.Eng. Approuvé par: Raman Raghavan P.Eng. Projet d'électricité prête pour l'hydrogène Résumé de la description initiale du projet IAAC 1 INFORMATIONS GÉNÉRALES CONTACTS ET ...