Clearwater River Dene Subdivision
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The proposed project
Planning design and construction of the Phase B subdivision in located in the Clearwater River Dene Band Indian Reserve No. 222 generally east of roadway Circle Drive North in the Registered Plan No. 79B04645 within the vicinity of NE 7-87-22-W3 and NW 8-87-22-W3. Infrastructure will include: new water and sewer mains, service connections, fire hydrants, primary power and street lights, roadways (within the subdivision and access to subdivision from Central Avenue - alignment yet to be confirmed).
The activities associated with this work will include:
• Planning, design and construction administration of a 29-lot subdivision including water and sewer mains, service connections, fire hydrants, primary power, roadways, drainage,
approaches, lot grading, street lights, and legal surveying (January 2022 – April 2023)
• Clearing and grubbing of proposed subdivision area (January 2022 to March 31, 2022)
• Tender Contract (April / May 2022)
• Construction (Spring / Summer 2022 - Completion Date)
Clearing and grubbing will occur during the winter months by the Band to avoid environmental concerns related to bird nesting. The bush and trees will be removed and disposed of in accordance with standard practices. Merchantable/useful timber will be salvaged and utilized by local band members.
At the award of the contract, the contractor will develop a roadway to serve the proposed lots for residential use. The roadways will be constructed in such a manner to achieve adequate positive drainage in the subdivision ditches. The underground water and gravity sewer pipelines will be installed below frost levels in the roadways.
Front portions of individual lots will be built up with local fill material (from road/ditching material) and serviced with individual water and sewer service connections. Power and streetlighting along the roadway network and individual lots will be installed by SaskPower following earthworks construction.
Most of the waste will consist of overburden earthen material (during clearing and grubbing). The proposed subdivision will be stripped of the topsoil and vegetation. The topsoil can be repurposed for landscaping following construction or used in an adjacent existing subdivision. Suitable excess soil will be utilized at the local landfill to provide cover. The useful timber will be salvaged as a source of local firewood. Other waste products associated with construction that cannot be repurposed will be disposed of at the local landfill.
Hazardous waste (spills) associated with heavy equipment use will follow provincial guidelines for disposal and reporting.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
2 | Notice of Determination for Clearwater River Dene Subdivision | - | April 19, 2022 |
1 | Public Comment Period on Intent to Make a Determination | - | March 18, 2022 |
Contacts
ISC-SKENVIndigenous Services Canada
1827 Albert Street
Regina, Saskatchewan S4P 2S9
Telephone: 306-581-3134
Email: isc-skenv@sac-isc.gc.ca
-
Location
- Clearwater River Dene IR 122 (Saskatchewan)
-
Nature of Activity
- Building and Property Development
-
Assessment Status
Completed -
Start Date
2022-03-18 -
Proponent
Clearwater River Dene Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
83481
Nearby assessments
...within 200 kilometres-
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
CLEARWATER RIVER DENE BAND NO. 222 (Tower 2) -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
CLEARWATER RIVER DENE BAND NO. 222 (Tower 1) -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
TURNOR LAKE I.R. 193B (Tower 2) -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
TURNOR LAKE I.R. 193B (Tower 1) -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
TURNOR LAKE I.R. 193B (Tower 3) -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
BUFFALO RIVER DENE NATION I.R. 193 (Tower 1) -
Fixed Point-to-Point Link from Buffalo Narrows, SK to Dillon, SK
Buffalo River Dene Nation I.R. 193 -
Buffalo River Dene Nation Subdivision Stage 4
Buffalo River Dene Nation IR 193 -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
BUFFALO RIVER DENE NATION I.R. 193 (Tower 2) -
Buffalo River Dene Nation Solid Waste Transfer Station
BUFFALO RIVER DENE NATION RESERVE #193 -
Chipewyan Prairie First Nation Housing Project 2020-21 (5 Units)
Chipewyan Prairie First Nation -
Chipewyan Prairie First Nation Janvier Secondary Egress Road
Chipewyan Prairie First Nation -
Chipewyan Prairie First Nation 2021 Subdivision Project (Phase 1)
Chipewyan Prairie First Nation -
Fort McMurray First Nation Water and Wastewater Infrastructure
Fort McMurray First Nation -
Fort McMurray First Nation: Gregoire Lake Water and Sewage Project
Gregoire Lake -
2017 NGTL System Expansion Project
Fort McMurray -
Clearwater Multi-User Access Project, Alberta
Clearwater River -
Patterson Lake South Mine Project
Patterson Lake -
Chipewyan Prairie First Nation Wastewater Treatment Plant Expansion
Chipewyan Prairie First Nation -
Rook 1 Project
Patterson Lake -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
WAPACHEWUNAK I.R. 192D (Tower 2) -
Wapachewunak Water Treatment Plant Optimization
Wapachewunak IR 192D -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
WAPACHEWUNAK I.R. 192D (Tower 1) -
Suncor Energy Coke Fired Boiler Replacement Project
25 kilometres north of Fort McMurray -
Suncor Base Mine Extension Project
3 kilometres north of Fort McMurray -
Jackpine Mine Expansion Project
Fort McKay -
Fort McKay First Nation K-9 School
Fort McKay First Nation -
Replacement of Water Crossing and Road Alignment
Primrose Lake Evaluation Range -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
CANOE LAKE I.R. 165 (Tower 1) -
Pierre River Mine Project
Fort McKay -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
CANOE LAKE I.R. 165 (Tower 2) -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
CANOE LAKE I.R. 165 (Tower 3) -
Frontier Oil Sands Mine Project
Fort McKay -
Canadian Natural Resources Limited - New radiocommunications towers on 06-09-069-04W4 and 11-04-069-04W4, Cold Lake Air Weapons Range, AB
06-09-069-04W4 -
Canadian Natural Resources Limited - New radiocommunications towers on 06-09-069-04W4 and 11-04-069-04W4, Cold Lake Air Weapons Range, AB
11-04-069-04W4 -
Canadian Natural Resources Limited - New radiocommunications tower on NW 34-68-4 W4M, Cold Lake Air Weapons Range, AB
NW 34-68-4 W4M. , Cold Lake Air Weapons Range, AB -
Weepuskow Sahgaiechan IR 165D Timber Harvest Plan 2020-21
WEPUSKOW SAHGAIECHAN IR 165 D -
La Plonge Solar Project
English River First Nation Reserve -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
LA PLONGE I.R. 192 -
Highway 165 Grade Raise near Beauval, SK
Beauval, SK -
Sundog Renewable Generating Station Project
130 kilometres upstream of Fort McMurray -
Cold Lake Air Weapons Range (CLAWR) Culvert Replacement
4 Wing Cold Lake