Construction of 20 Housing Lots on North Spirit Lake First Nation
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The Proposed Project
North Spirit Lake First Nation is proposing the development of 20 housing lots within the community. Project activities will include:
- Construction of 20 new infill housing lots along existing roadways. Each lot is to be approximately 800 m2, with the project area totaling at 16,000 m2;
- Clearing and grubbing of vegetation - some of which have already been cleared - followed by site grading;
- Excavation and backfilling of some lots; And
- Connection to the community's existing utility services (where possible) and extension of utility services - such as hydro-electric, telecommunication, water and wastewater services.
Earth borrow material will be sourced from the commnunity's pit/quarry to backfill lots as required. Waste generated through this project will include debris and earth from lot clearing, grubbing and excavation of poor performing soils, and will be hauled to the community's landfill and/or pit/quarry to be disposed of or stockpiled for future use. All timber generated from clearing activities will be recovered by community members as a wood heat source.
Although no species at risk have been reported by community members, there is still potential that some species may inhabit the project area. To address this risk, North Spirit Lake First Nation will have an environmental consultant conduct an environmental field study during the planning and engineering phase of the project. If any species at risk are identified, appropriate mitigation measures will be implemented to protect nesting sites and habitats, and lot locations will be adjusted as necessary to minimize disturbance.
Latest update
April 24, 2025 - Determination of environmental effects of the proposed Construction of 20 Housing Lots on North Spirit Lake First Nation is no longer required as the Environmental Impact Assessment has been cancelled.
Participate
Contacts
Indigenous Services CanadaHannah Silvaggio, Environment Officer
100 Anemki Place, Suite 101
Fort William First Nation, Ontario P7J 1A5
Telephone: 807-624-5921
Email: hannah.silvaggio@sac-isc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- North Spirit Lake First Nation (Ontario)
-
Nature of Activity
- Building and Property Development
-
Assessment Status
Terminated -
Start Date
2025-03-21 -
Proponent
North Spirit Lake First Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
89378
Nearby assessments
...within 200 kilometres-
Demolition of Abandoned Houses in Residential Area on North Spirit Lake First Nation
North Spirit Lake First Nation -
New Fibre Installation / Upgrade Multiple Towers
Weagamow PoP -
New Fibre Installation / Upgrade Multiple Towers
Deer Lake PoP -
New Fibre Installation
North Spirit Lake -
New Fibre Installation / Upgrade Multiple Towers
Big Trout Lake PoP -
New Fibre Installation / Upgrade Multiple Towers
Wapekeka (Angling Lake) PoP -
Keewaywin First Nation New Landfill Access Road Construction
Kee-Way-Win First Nation -
Sandy Lake Cultural Area
Sandy Lake -
Sandy Lake First Nation - Child and Family Services Building
Sandy Lake First Nation -
New Fibre Installation / Upgrade Multiple Towers
Muskrat Dam PoP -
Sandy Lake First Nation - Child and Family Services Building
Sandy Lake First Nation -
Sandy Lake First Nation Remediation Project
Sandy Lake First Nation -
Sandy Lake First Nation - Health Services Building
Sandy Lake First Nation -
Sandy Lake First Nation - Accommodations Building
Sandy Lake First Nation -
Construction of 10 Houses within Deer Lake First Nation
Deer Lake First Nation -
Deer Lake First Nation Small Business Center Project
Deer Lake First Nation -
New Fibre Installation / Upgrade Multiple Towers
Kewaywin PoP -
Pikangikum First Nation - 10 Unit Residential Construction Project
Pikangikum First Nation -
Pikangikum Cultural Learning and Community Centre
Pikangikum First Nation -
Pikangikum Remediation
Pikangikum First Nation -
Pikangikum First Nation - Nursing Station Fuel Storage Tank System Repairs
Pikangikum First Nation -
Pikangikum Rapid Housing Initiative
Pikangikum First Nation -
New Fibre Installation / Upgrade Multiple Towers
Kasabonika Lake PoP -
New Fibre Installation / Upgrade Multiple Towers
Wunnumin Lake PoP -
Cat Lake First Nation - Subdivision Development Project
Cat Lake First Nation -
New Fibre Installation / Upgrade Multiple Towers
Kasabonika Lake Wireless Tower -
Cat Lake First Nation - Lot Servicing for future houses
Cat Lake First Nation -
North Caribou Lake First Nation Water Treatment System Upgrades
North Caribou Lake First Nation -
New Fibre Installation / Upgrade Multiple Towers
Sachigo Lake PoP -
North Caribou Lake First Nation - Immediate Housing - Lot Servicing
North Caribou Lake First Nation - Weagamow Lake -
North Caribou Lake First Nation - Teacherages Project
North Caribou Lake -
North Caribou Lake First Nation School
North Caribou Lake First Nation -
North Caribou Lake First Nation - Backup Power Decommissioning Project
North Caribou Lake First Nation -
North Caribou Lake First Nation - Lot Servicing for Housing Development
North Caribou Lake First Nation -
Muskrat Dam Lake First Nation - 25 Lot Subdivision Development
Muskrat Dam Lake -
New Fibre Installation / Upgrade Multiple Towers
Cat Lake Wireless Tower -
Muskrat Dam - Reverend Tommy Beardy Memorial Family Treatment Centre Remediation
Muskrat Dam First Nation -
Springpole Gold Project
110 kilometres northeast of Red Lake -
Sachigo Lake First Nation - Lot Servicing for future houses
Sachigo Lake First Nation -
Sachigo Lake First Nation Wastewater Treatment Project
Sachigo Lake First Nation -
New Fibre Installation / Upgrade Multiple Towers
Kingfisher Lake PoP -
Pauingassi First Nation Child and Family Services Prevention Building and Staff Housing
Pauingassi First Nation -
Little Grand Rapids First Nation Transitional Housing (Temporary Housing)
Little Grand Rapids First Nation -
Little Grand Rapids Submarine Cable Installation Project
Little Grand Rapids -
Aboveground Fuel Storage Replacement in Little Grand Rapids, Manitoba
Little Grand Rapids -
Little Grand Rapids First Nation School
Little Grand Rapids First Nation School -
Southeast CFS Little Grand Rapids Staff Housing (Personnel and Visiting Professionals) and Prevention Centre
Little Grand Rapids First Nation -
Little Grand Rapids RCMP New Living Quarters
Little Grand Rapids -
Little Grand Rapids Dock & Dock Foundation Posts
Little Grand Rapids -
Peguis First Nation Landfill Expansion
Peguis First Nation -
New Fibre Installation / Upgrade Multiple Towers
North Spirit Lake PoP -
Slate Falls Nation - Lot Servicing for future houses
Slate Falls Nation -
NAV CANADA Radiocommunication Antenna Addition in Island Lake, MB
Island Lake Tower 2, MB -
NAV CANADA Radiocommunication Antenna Addition in Island Lake, MB
Island Lake Tower 1, MB -
NAV CANADA Radiocommunication Antenna Addition in Island Lake, MB
Island Lake Tower 3, MB -
Great Bear Gold Project
23 kilometres southeast of Red Lake -
Aboveground Fuel Storage Replacement in Island Lake, Manitoba
Island Lake -
Garden Hill First Nation Road Upgrades
Garden Hill -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers, and New Fibre Installation
Project Site 22: Island Lake region - Garden Hill Band Office -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers, and New Fibre Installation
Project Site 27: Island Lake region - Red Sucker Lake Nursing Station -
Great Bear Advanced Exploration Project
25 kilometres southeast of Red Lake -
Red Sucker Lake New School and Servicing
Red Sucker Lake First Nation New School and Services -
Red Sucker Lake First Nation New Landfill
Red Sucker Lake -
STPFN Wastewater Treatment Plant Upgrade and Expansion Project
St. Theresa Point First Nation -
Red Sucker Lake First Nation New Aerated Lagoon
Red Sucker Lake First Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers, and New Fibre Installation
Project Site 14: Island Lake region - Theresa Point Band Office -
St. Theresa Point First Nation - Old Bulk Fuels Decommissioning
St. Theresa Point First Nation -
STPFN Wastewater Treatment Plant Upgrade and Expansion Project
St. Theresa Point First Nation -
St Theresa Point Northern Store Contamination Remediation
St Theresa Point Former Bulk Fuel Plant -
St Theresa Point First Nation road re-construction
St Theresa Pt First Nation -
Griffith Iron Ore Redevelopment Project
Ear Falls